The current Labor contractor rates in Bangalore is Rs 240 / sq ft to Rs 280 / sq ft. There are two ways to go ahead with construction for a Building its either give it to Building contractors who take care of all materials required for construction or one can give it to Labour contractor in Bangalore who can execute the project.

But in the case of a labour contract, the owner has to supply all materials required to the site well in advance before the start of the specific construction work based on the given house plans.

As residential Architects, we recommend going for a Labor contract only if you are self-employed and can spend quality time on the site.

SAMPLE  LABOUR CONTRACTOR RATES IN BANGALORE

The rates for labor contractor for works is Rs 290 / sq ft

  1. PCC 1:4:8  4” thicknesses for the foundation.
  2. Size stone masonry 6 courses for foundation footings.
  3. Plinth concrete 5” thickness.
  4. Inside Floor PCC 5” Thickness.
  5. 9” and 4” thickness brickwork for walls.
  6. Door and Window Frames Fixing.
  7. Lintel concreting.
  8. Roof concreting.
  9. Inside Ceiling and wall plastering with lime rendering.
  10. External plastering with Sponge finish.
  11. Inside Loft and shelves concreting.

Extra Labor works :

  1. Markings.
  2. Earth Work.
  3. Footing and columns.
  4. Balcony.
  5. Portico.
  6. Staircase.
  7. Folding steps.
  8. Para foot wall.
  9. Sump Tank.
  10. Compound Wall.
  11. Railing fixing.
  12. Gate Fixing.
  13. External Concrete and finishing.
  14. Roof waterproof muddy.
  15. Overhead tank.
  16. Concrete gang labour.
  17. Scaffolding materials.
  18. Water curing and watchman payments.
  19. Taper Roof is a double measurement.
  20. Folding Staircase/Cantiliver staircasce.

NOTE : The above work rates are depending upon quantity, time and elevation design drawing.

LABOR Contractor Rates  in Bangalore for Civil works Based on Item Rates

Labour/Labor contractors rates in Bangalore/Hire Labor contractors in Bangalore
SL.NO ITEM DESCRIPTION for Labour Rates UNITS RATE
1 Earth work excavation cft 9.00
2 Earth filling cft 5.00
3 Sump water tank solid block wall Lts 3.00
4 sump tank rcc wall -sump tank Lts 5.00
5 Shuttering sft 45.00
6 Bar bending kg 9.00
7 P.C.C Concrete sft 40.00
8 Footing concrete cft 45.00
9 Size stone masonry cft 40.00
10 column concrete cft 65.00
11 R.C.C Roof slab & Beam concrete cft 60.00
12 R.C.C Slope roof concrete cft 75.00
13 8″ Block work sft 33.00
14 6″ Block work sft 25.00
15 4″Block work sft 20.00
16 Internal Ceiling Plastering sft 20.00
17 Internal Wall plastering sft 18.00
18 External Wall plastering sft 22.00
19 Door & Windows Fixing sft 35.00
20 Ventilators fixing nos 350.00
21 2″&3″ Band rft 30.00
22 3/4″ Groove rft 15.00
23 Cylinder Filling (Bath Room) cft 30.00
24 Parapet Wall (Block Work& Plastering) sft 55.00
25 Water proof plastering sft 25.00
26 (Lead & Lift )
27 First floor 10%
28 Second floor 15%
29 Third floor 20%
30 Fourth floor 25%
31 Watchman salary per month 3000

.
Note: These rates might vary from Project to Project.

S.No Labor/Labour work requirement for different Construction works in Bangalore for Earthworks, Concrete, RCC work, Stone work, Brick work, Flooring, Plastering, Painting etc

Item Description

Quantity unit                                          Labour required 
Skilled Labour Helpers Curing Labour Mason/
White washer
Carpenters Fitter
1 Earthworks per 28.30 cum  (1000cft)      —  —  —  —  —  —
  Earth works excavation in foundations, trenches etc., in ordinary soil including disposal up to 30m and lift of 1.5m 28.30 Cum 5 4  —  —  —  —
  Refilling excavated earth in foundations, plinth etc. including consolidation in 15cms layers 28.30 Cum 3 2 0.5  —  —  —
  Disposal of surplus earth within a lead of 30m 28.30 Cum  — 1  —  —  —  —
2 Cement concrete work per 2.83cum (100 cft)      —  —  —  —  —  —
  Laying Cement concrete 2.83 Cum 2 3 0.75 0.25  —  —
3 R.C.C work      —  —  —  —  —  —
  Laying Reinforced concrete 2.83 Cum 3 3 1.5 0.5  —  —
  Centring and shuttering for Flat surface 9.60 Sqm 4  —  —  — 4  —
  Reinforcement work for RCC 100.00 Kgs 1  —  —  —  — 1
4 Stone work per 2.83 cum (100Cft)      —  —  —  —  —  —
  RR Masonry with blue stone in foundations 2.83 Cum 3 2 0.5 3  —  —
5 Brickwork per 2.83 cum      —  —  —  —  —  —
  Ist class brickwork in 1:4 CM insuper structure partition walls, junctions of roof, parapet walls and string course 2.83 Cum  — 4.5 0.5 2.25  —  —
6 Flooring      —  —  —  —  —  —
  4cm thick CC flooring of 40Sqm 40.00 Sqm 4 3 1  —  —  —
7 Finishing      —  —  —  —  —  —
  Plastering with any mortar 12mm thick 40.00 Sqm  — 3 1 3  —  —
  Whitewashing or colour washing (3coats) 60.00 Sqm  — 1  — 1  —  —
  Painting two coats such as chocolate, red, greyetc., on wood or steel 10.00 Sqm  — 2  — 3  —  —

 

Note: These values might vary from Project to Project.