Plumbing rates in Bangalore find Plumbing labor rates in Bangalore for all kinds of plumbing works

PLUMBING LABOUR RATES PER BATHROOM Rs 7,000 (Basic) to Rs 10,000 (Basic)

The current Plumbing rates in Bangalore varies between Rs 7,000 to Rs 15,000 for each Bathroom which includes the fixing of shower panels, western closet (WC), washbasins, health faucet, showerheads, mixtures, two-way diverters, valves,  all taps, solar hot water valve, shower enclosures fittings, soap racks, towel rod, holders, flush tank, etc.

The above costs include all plumber labor works insides the bathroom, inclusive of piping works also. At Architects4Design.com, we give detailed plumbing drawings so that the project plumb lines area is planned well before the project start.

INCLUDING MATERIALS and LABOR rates Rs 50,000 (Basic) to Rs 80,000 (Standard)

For a Bathroom to be made fully fitted with materials and labor, including all basic fittings will cost Rs 50,000 for a small bathroom and upwards of Rs 80,000 for a Standard bathroom size. These proposed rates don’t include high-end bath wares like the bathtub, Jacuzzi, shower enclosures, steam, etc.

One can decide on his budget on how much one wants to spend on additional fit-outs. In today’s lifestyle, one efficiently spends upwards of Rs 1 lac for an attached bathroom. As architects based at we design house plans in Bangalore which have decent sized bath areas.

Type Plumbing rates in Bangalore/ Plumber rates / Plumber labour work cost in Bangalore
DETAILS of PLUMBING WORKS 
 LABOR charges (per bathroom) LABOR &     MATERIAL
Basic Labor rates for laying of CPVC/PVC pipes for water supply including fittings, chase cutting, hole cutting, making the walls good, Laying of PVC/UPVC pipes for soil & waste including accessories, installation of CP fitting & fixtures which includes 1 basin,1 Mirror,1 Towel rail, 2 tap points,1 Electric water heater,1 European water closet & 1 shower. Rs 7000/- Rs 50,000/-
Standard Labor rates for laying of CPVC/PVC pipes for water supply including fittings, chase cutting, hole cutting, making the walls good, Laying of PVC/UPVC pipes for soil & waste including fittings, installation of CP fitting & fixtures which includes 1 basin,1 Mirror, 1 Towel rail,2 tap points,1 Electric water heater,1 European water closet, 1 Shower, Wall mixture, Basin mixture & Health faucet. Rs 10,000/- Rs 80,000/-

 

ITEM RATES FOR PLUMBING LABOR WORK

The below mentioned are item rates for plumbing labor costs in Bangalore for all kinds of work, including rainwater harvesting, drainage lines, excavation, PCC, water supply lines, bathtub or Jacuzzi fitting, waterproofing, shower cubical, drain pit construction, etc. The current overall cost of construction in Bangalore for a residential building is at Rs 1360 / sft to Rs 1600 / sft.

 

Sl. No. Item rates for Plumbing work / Plumbing labour work in Bangalore
DETAILS of PLUMBING WORKS 
Labor Rate
1 UPVC Rainwater pipes(100mm dia) 150/ rm
2 Soil & Waste pipes(100mm dia PVC/UPC) 170/rm
3 Drainage line for soil & waste( S.W. Pipes 100 mm dia) including civil work such as excavation, P.C.C. encasing, etc. 350/-
4. Water supply line for the riser,downtake, tank connection &ring line(upto 50mm dia PVC/CPVC) 125/-rm
5. JACUZZI/BATHTUB LS : 3000/-
6. SHOWER CUBICLE LS : 2000/-
7. WATERPROOFING 200/Sq.mtr

Abbreviations used  : LS : Lump sum , RM – Running meter, Sq.mtr – Square meter, SFT- Square Feet.

Comments 3

  1. Drainage connection cost

    Reply

Leave a Comment

CONTACT US
Please Share your Query details.! Our Team shall GET in Touch...!
Get a Free Quote..!
CONTACT US
Do let us know how we could help you!
CALL US to get a quote..