Current construction cost

The current Construction cost at Bangalore based on Item rates

There is an increase in construction cost in Bangalore which has seen an increment of 10% when compared to the previous year. This has been caused due to the increase in the real estate market in the housing sector where the demand for the labour and construction rates has been in huge demand.

The current construction cost varies from Rs 1300 to Rs 1850 / sq ft depending on the internal finishes. Below is a sample on item rate construction proposal and visit this link to know building contractors rates.

CURRENT COST OF CONSTRUCTION based on ITEM RATES

     ITEM RATE
Sl No.DescriptionUnitRate/Unit14%6% AMOUNT
1Excavation up to 1.5m Hardsoilcum2102914253.00
1.5- 3 mcum3164421381.00
2Antitermitesm900595.00
3PCC M10cum37505252254500.00
4RCC Designmix M 20cum52227313576310.00
Shutteringsm3504924423.00
M25cum55117713766658.00
Shutteringsm4004000800.00
5Reinforcement Steel
Fe-415Tonne480008400360060000.00
Fe-500Tonne551999660414068999.00
Fe-550Tonne557129750417869640.00
6Block Work
4″Thicksm614860700.00
6″ Thicksm7578050887.00
8″ Thicksm856120501026.00
7Brick Work Table Molded
 9″ Thickcum54007653696534.00
4″ Thicksm75410657917.00
Modular Bricksm6569144791.00
8Plastering
12mm Thicksm1652010195.00
20mm Thicksm2113014255.00
Ceilingsm154219184.00
9Flooring
Vitrified tilessm1200168821450.00
Granilte 20mmsm30004201803600.00
Ceramic Tilessm881123601064.00
Dadoingsm874122591055.00
Solingcum1645230991973.70
VDF 75MM thicksm7009842840.00
Wet mix  sand filling dustsm1038145621245.00
Stair case Granite Hassan 10mmsm28273951693391.00
Granilte 20mmsm37325222234477.00
Nosing FullRM1842511220.00
Telephonic Granite 20mmsm23923341432869.00
Teak wood flooring woodensm48006722885760.00
Wall claddingsm29304101753515.00
 Clay tile Yaiahankasm1630228971955.00
Terrace tilingsm6358938762.00
Half nosingRM2403314287.00
10Size Stone Masonry 1:6
Foundationcum32874601973944.00
Basementcum49146872945895.00
S pointingsm740074.00
11Doors Teak Wood
Door Framecum162819227949767195380.00
Door Shutterssm68889644238275.00
Grill WorkKg90125107.00
12Windows Aluminium Powder coated
2 Tracksm36165062164338.00
3 Tracksm38135332284574.00
Doorsm59568333577146.00
4 Tracksm33674712024040.00
Z Angie aluminiumsm42866002575143.00
Steel glazed windowssm34334802054118.00
13Painting
Oil Bond 2 Coatssm7511590.00
Doors & Windows Enamelsm466355.00
Grillsm7210486.00
14Water Proofing Terracesm73510344882.00
Slab/Roofsm917128551100.00
Toilets/Overhead Tank/Sump Tanksm1000140601200.00
15Staircase Hand railing MSsm30964331853714.00
Teak wood VMRM785710994719427.00
16Providing chajja 75mm thicksm3835323459.00

Abbreviations used 
sm: square meter rm: running meter kg: Kilogram cum: cubic meter

If you are planning to start your construction after finalising the house plans given by the architects, then you have two ways of presenting your project either to building contractors or a Labor Contractors.

Current construction cost
4.7 (93.08%) 26 votes

Leave A Comment

[]
1 Step 1
E N Q U I R Y F O R M
Name
Mobile no
email id
Enquiry details
0 /
Previous
Next
CALL US to get a quote..
$('#myModal').modal({backdrop: 'static', keyboard: false})